The trial initiated as part of the research project was always intended to have a life-span of longer than the duration of the HEA funded project.  
+
The trial initiated as part of the [http://www.e-consultation.org research project] was always intended to have a life-span of longer than the duration of the HEA funded project.  
  
 
[http://www.nsec.info NSEC] is its infancy and it is the desire of the [http://www.e-consultation.org research team] to fully develop the relationship between the two teams where possible.  
 
[http://www.nsec.info NSEC] is its infancy and it is the desire of the [http://www.e-consultation.org research team] to fully develop the relationship between the two teams where possible.  

Latest revision as of 16:46, 26 April 2007

The trial initiated as part of the research project was always intended to have a life-span of longer than the duration of the HEA funded project.

NSEC is its infancy and it is the desire of the research team to fully develop the relationship between the two teams where possible.

As a result in the latter stages of the e-consultation project a future work programme was agreed as follows:

  1. The e-consultation research team are to brief the new NSEC team members in July 2006.
  2. The web sites will be transferred to the NSEC site in July 2006.
  3. The e-consultation exercise involving school children and young people who have participated in exchange programmes is to be initiated in Sept. 2006.
  4. E-enable focus groups are to be initiated in Jan 2007.